Production Planning (MRP)

Operations & Supply

DZ-URT

Bill of materials, work orders, capacity planning, material requirements planning and shop-floor tracking.

  • Multi-level BOM
  • Capacity planning
  • Shop-floor terminal
  • Actual costing
Production Planning (MRP)
Production Planning (MRP)
Production Planning (MRP)

The Production module plans the chain from order to dispatch. Material requirements are calculated across a multi-level bill of materials; missing raw material automatically creates a purchase requisition.

Key capabilities

  • Multi-level bill of materials (BOM), alternative materials and scrap rates
  • Work orders, routing (operations) and machine capacity planning
  • MRP: net requirements, lead time, safety stock
  • Shop-floor terminal: start/finish jobs, downtime reasons, scrap entry
  • Actual costing: material, labour and overhead allocation

Bottlenecks are tracked through planned-versus-actual comparison and OEE indicators.

Which plan?

Available on the Enterprise plan and commissioned by our setup team with a sector-specific template (metal, plastics, textiles, food, furniture). A typical manufacturing project takes 8–12 weeks.

BOM levelsUnlimited
PlanningMRP / MPS
Shop-floor terminal+
OEE+
WhatsApp +90 232 555 61 00 bilgi@duzlem.com.tr